Installing the current release as a test system

The following table describes the steps you must follow in order to begin the installation of the full upgrade to the current release as a test system. Mark the Check column of the following table as you complete each step. You may exclude those steps that are optional or not applicable to your site. All steps must be completed in sequence.

Table 2 Installation checklist

Check

Step and Description

 

Step 1. Prepare a plan

 

Step 2. Install the current release as a test system

 

Step 3. Install the IOA component

 

Step 4. Install Control-M

 

Step 5. Install Control-M/Restart

 

Step 6. Install Control-D

 

Step 7. Install Control-V

 

Step 8. Install Control-O

 

Step 9. Install Control-M/Analyzer

 

Step 10. Install Control-M/Tape

 

Step 11. Install IOAGATE

 

Step 12. Install Control-M Application Server (CTMAS)

 

Step 13. Install Control-M/JCL Verify

Parent Topic