Previous Topic

Next Topic

Book Contents

Book Index

Workload Management Entry Panel

The entry panel is displayed upon entering the Workload Management facility, option W on the IOA Primary Option menu.

Figure 138a Workload Management Entry Panel

 --------------------  WORKLOAD MANAGEMENT - ENTRY PANEL  --------------------(W)

 COMMAND ===>                                                                   

                                                                                

                                                                                

 Please Specify Option ===>                                                     

                                                                                

                       WL  Locally Managed (CTM) Workload Policies              

                                                                                

                       WG  Globally Managed (EM) Workload Policies - View only  

                                                                                

                                                                                

                       ID  Load-Indexes Definition                              

 

                       IS  Load-Indexes Status                                  

 

For the management of Workload Policies, enter the command for the relevant type of Workload Policies:

Command

Description

WL

Locally managed Workload Policies created and managed in Control-M for z/OS

These Workload Policies support workload optimization using Load-Indexes.

WG

Globally managed Workload Policies created and managed in Control-M/EM

Workload Policies of this type are for viewing only, and cannot be managed through this facility.

Global Workload Policies are supported by Control-M Batch Impact Manager (BIM) for use in the monitoring of critical job flows.

Note: The WORKLDPL parameter controls which of these types of Workload Policies are available for use by your Control-M installation (whether only global, only local, or both). The WORKLDPL parameter is customized during Control-M installation or customization. For more information about this parameter, see Step 2.1 – Control-M operational parameters in the INCONTROL for z/OS Installation Guide: Installing or Selector subtask section in the INCONTROL for z/OS Installation Guide: Customizing.

For the management of Load-Indexes, select one of the following commands:

Command

Description

ID

Display a list of Load-Indexes in the Load-Indexes Definition screen, and create new Load-Indexes or manage the definitions of existing Load-Indexes.

IS

Track the current status of defined Load-Indexes in the Load-Indexes Status screen, override the load level of any specific Load-Index, and view a history of load levels and changes for any Load-Index.

Parent Topic

Workload Management facility