Calendar management

Calendars enable you to define a set of scheduling criteria and then apply those criteria to job schedules by specifying the calendar name in the job definition, which saves having to define those sets of criteria individually in each job.

You define, view, edit, delete, or calendars based on specific scheduling criteria that are used to define scheduling in a job definition from the Tools domain. If you want to use a predefined calendar when defining a job, it must be checked into Control-M.

You can create one of more of the following calendar:

When defining a calendar, you can create global calendars for all Control-M Servers by selecting ALL in the Control-M Server field. For example, if have a number of Control-M/Servers and you do not want a job to run on public holidays, create a global rule based calendar for all of your Control-M/Servers.

After you have checked in the calendar, the calendar is synchronized with Control-M Server. If you have selected a global calendar, you can check the synchronization status of each Control-M/Server. For more details about synchronization status, see Synchronization status parameters.

If Control‑M/Forecast is installed, you can display when and how often jobs are scheduled by clicking View Schedule. For more information on validating your job definition, see Forecast.

If Control-M/Forecast is not licensed at your site, you can use the CTMRPLN utility to produce a report that indicates when jobs in a selected calendar are scheduled to run. For more information, see ctmrpln and the Control‑M for z/OS User Manual.