Do Actions enable actions to be performed when the rule is triggered, which are performed sequentially.
The following are valid Do Actions:
Do Condition: Enables you to add or delete a prerequisite condition. When a rule containing a DO COND statement is triggered, the designated prerequisite conditions are added or deleted (as specified) from the IOA Conditions file by the Control-M monitor. For more information about the Do Condition parameters, see Do Condition parameters.
Do Resource: Enables you to change the quantity of a Control-M Quantitative Resource. For more information about Do Resource parameters, see Do Resource.
Do CTD Request: Enables you to force a Control-D Mission, when Control-D is installed. For more information about CTD Request parameters, see CTD Request parameters
DO Force Job: Enables you to force a job in Control-M Active Jobs, even if the basic scheduling criteria of the job are not satisfied. For more information about Do Force Job parameters, see Do Force Job parameters.
Do Stop job: Enables you to stop executing a current job. The job terminates at the end of the current step. No other parameters are needed.
Generally, all actions from triggered rules are performed except when multiple rules are triggered by the same job arrival event and each of the triggered rules contains Do Force Statements. Do Force Statements of the first triggered rule are performed but the Do Force job statements of the other rules triggered by the event are not performed. For more information, see CMEM Rule Ordering, Triggering and Deactivation in INCONTROL User Guide.
NOTE: You can add Do Actions by clicking on in the Do Actions tab. You can delete Do Actions by clicking next to the Do field.