The following table describes the fields used to create scheduling for a job
Field |
Description |
---|---|
Defines the Scheduling options for the Schedule field in the Scheduling tab of the Properties pane. |
|
View Schedule |
Defines the button to click to view the schedule graphically. |
Time Settings |
Defines an area in the Scheduling tab of the Properties pane where the time frame of the job's start running time is defined. This includes From Time/To Time and Must End. |
Sets time limits for submitting the job. For z/OS jobs, includes the days |
|
Sets time limits for submitting the job. You can select one of the following options:
|
|
Sets the time and day when the job must finish executing. (z/OS only) |
|
Rerun Settings |
Defines an area in the Scheduling tab of the Properties pane to set rerun settings including Cyclic, Maximum reruns, and Rerun Member. |
Indicates that the job must run at a designated time, interval of time. To set a cyclic job, see Setting Cyclic jobs. |
|
Determines the maximum number of reruns that can be performed for the job. |
|
Defines the name of the JCL member to use when the job automatically reruns. For z/OS jobs. |
|
More |
Defines an area of the Properties pane to click to define more parameters. |
Indicates the time zone according to which the job should be scheduled. |
|
Confirmation Calendar |
Area of the Scheduling tab of the Properties pane that describes the calendar and Exception policy parameters. |
Indicates the name of a Control-M calendar that is used to validate scheduling dates. A shift value can be used to indicate how to handle jobs that are scheduled for a non-working day in the calendar. |
|
Specifies what to do if a job is supposed to run on a day that is not in the confirmation calendar. |
|
Activity Period |
Defines the area in the Scheduling tab of the Properties pane that describes Active/Not Active between dates, Start Date, End Date, and Statistics Calendar. |
Determines a date range (Start Date - End Date) when the job or folder can be ordered or the Rule-based Calendar (RBC) can be used. During the period that the job or folder is outside the active range (non active), it is not eligible to be ordered, if the relationship between Job Scheduling definitions and Rule Based Calendars is set to AND (Default: OR). If the relationship is set to OR, the job is eligible to be ordered depending on the RBC criteria. |
|
Sets the date when the job must be ordered. |
|
Sets the date when the job must be ordered. |
|
Name of the Control-M periodic calendar within which statistics relating to the job are collected. z/OS parameter. |
|
View |
Defines a View button that enables you to view the Statistics related to the Statistics Calendar. |
Active Environment Retention |
Defines an area in the Scheduling tab in the Properties pane that describes the Keep Active for parameter. |
Determines the number of extra days (beyond the original scheduling date) that the job is allowed to remain in the Active Jobs database while awaiting execution. If the job still has not run after the specified number of days, the job is removed from the Active Jobs database. |
|
Determines whether to adjust the logical date for a job converted from a scheduling product other than Control‑M. z/OS parameter |
|
Indicates if the job did not get ordered on its original scheduling date, it is ordered after its original scheduling date has passed. |
Parent Topic |