Scheduling a job/folder

This procedure describes how to schedule a job, which enables jobs that are in Production to run on their order date, if all other prerequisites are met.

Before you begin

Ensure that you open the Workspace that holds the job you want to schedule, as described in Workspace management.

To schedule a job/folder:

  1. In the Workspace, select the job.
  2. Click Detailsor click the job.
  3. Select the Scheduling tab.

    The Scheduling parameters appear.

  4. From the Schedule drop-down list, select a scheduling type, as described in Scheduling options.
  5. In the Time Settings area, set From Time and To Time, as described in From Time/To Time.
  6. In the Time Settings area, set From Time and To Time, as described in From Time/To Time.
  7. To set the job to rerun, from the Rerun Settings, select Cyclic.

    The Rerun setting appears in the box below the Cyclic checkbox.

  8. To change the cyclic settings, see Setting Cyclic jobs.
  9. Set the relevant parameters, as described in Scheduling parameters.

    You have scheduled your job or folder. You can click View Schedule at any time, if you have the Control-M/Forecast Add-on.

    For more information about RBC lists and Excluded RBC lists, see Rule-based Calendar and Excluded Rule-based Calendar lists.

Parent Topic

Job scheduling