Previous Topic

Next Topic

Book Contents

Book Index

Step 4: Run the Multisystem Upgrade job on the master IOA environment

Run the Multisystem Upgrade job, UPGJMSTR, through ICE on the master IOA environment.

To run the Multisystem Upgrade job

  1. On the master environment, tailor the UPGJMSTR job using the Tailor Job option in ICE (available by selecting Maintain your Environment => ICE refresh).

    Set the date of the snapshot to be used in the Multisystem Upgrade, as it appears in the low level qualifier (LLQ) of the mlprefa.Syymmdd data set. To set the date, use JCL variables SLAVEYY, SLAVEMM, and SLAVEDD.

    Choose the relevant mlprefa.Syymmdd data set:

    Warning: If you are running the current step on the same day that the existing data set was generated, you must prevent the existing mlprefa.Syymmdd data set from being overwritten. Rename the existing mlprefa.Syymmdd data set by adding a single character to the end of its name. For example, rename to mlprefa.Syymmdd1. Adjust the SLAVEDD variable accordingly.

  2. Submit the UPGJMSTR job.

    The UPGJMSTR job generates the following items:

    Note: If the UPGJMST job does not end successfully, that is, the job returns a non-zero RC, check for a detailed error description and guidance in the MSUREP1 member in the INSTWORK library.

Parent Topic

Multisystem Upgrade steps