A SMART Table Entity must be defined for each SMART Table before the job scheduling definitions in the table can be defined.
A skeletal scheduling definition for a SMART Table Entity is automatically displayed when creating a SMART Table.
The scheduling definition for a SMART Table Entity can also be entered directly from the Entry Panel or from the Job List screen.
The job scheduling definition for SMART Table Entities varies somewhat from the job scheduling definition for jobs.
The parameters of the SMART Table Entity are used to define basic scheduling criteria, runtime scheduling criteria, and post-processing actions to be performed, for the jobs in the SMART Table.
During New Day processing, if at least one set of basic scheduling criteria in the SMART Table Entity is satisfied, a copy of the SMART Table Entity is placed in the Active Jobs file, and the jobs in the SMART Table become eligible for scheduling.
The final status of the SMART Table Entity job order is assigned after all scheduled jobs in the SMART Table have been terminated. This SMART Table Entity status is determined by the execution results of those jobs:
The performance of post-processing actions defined in the SMART Table Entity is directly affected by the end status of the SMART Table Entity.
Figure 23 SMART Table Entity Scheduling Definition Screen
TBL ACCOUNTS_TABLE CTM.PROD.SCHEDULE(TBL)
COMMAND ===> SCROLL===> CRSR
+------------------------------------------------------------------------------+
| TABLE ACCOUNTS GROUP ACCOUNTS_TABLE |
| OWNER N04B TASKTYPE TBL |
| APPL |
| DESC |
| ADJUST CONDITIONS N TBL MAXWAIT STAT CAL |
| KEEP JOBS UNTIL REMOVED Y KEEP AT LEAST 05 DAYS AFTER ENDED NOT OK |
| SET VAR |
| DOCMEM ACCOUNTS DOCLIB CTM.PROD.DOC |
| ============================================================================ |
| SCHEDULE RBC EVERYDAY LEVEL TBL |
| DAYS DCAL |
| AND/OR |
| WDAYS WCAL |
| MONTHS 1- Y 2- Y 3- Y 4- Y 5- Y 6- Y 7- Y 8- Y 9- Y 10- Y 11- Y 12- Y |
| DATES |
| CONFCAL SHIFT MAXWAIT 00 |
| SCHEDULE RBC ACTIVE FROM UNTIL |
| ============================================================================ |
| SCHEDULE RBC LEVEL |
|============================================================================= |
| IN |
| CONTROL |
| FROM TIME + DAYS UNTIL TIME + DAYS |
| DUE OUT TIME + DAYS PRIORITY SAC CONFIRM |
| TIME ZONE: |
| ============================================================================ |
| OUT |
| MAXRERUN |
| CYCLIC TYPE: C INTERVAL FROM |
| INTERVAL SEQUENCE: + + + + + |
| SPECIFIC TIMES: TOLERANCE |
| + + + + + |
| ON TABLE-END NOTOK |
| DO COND ACCTS-CHK-REQUIRED ODAT + |
| ON VAR |
| DO |
| SHOUT WHEN TIME + DAYS TO URGN |
| MS |
====== >>>>>>>>>>>>>>>>>>>>> END OF TABLE PARAMETERS <<<<<<<<<<<<<<<<<<< ======
The SMART Table Entity scheduling definition supports the same commands and PFKey conventions as any job scheduling definition.
Parent Topic |