Runtime Scheduling Parameters

Figure 21 Runtime Scheduling Parameters

 ==================================================================  

IN       START-DAILY-BACKUP   ODAT                                 

CONTROL                                                            

RESOURCE INIT                 0001    CART                         

PIPE                                                               

FROM TIME         +     DAYS    UNTIL TIME      +     DAYS

DUE OUT TIME      +     DAYS    PRIORITY     SAC    CONFIRM

TIME ZONE:                                                  

===================================================================

Table 39 Runtime Scheduling Parameters

Parameter

Description

INM

Prerequisite conditions for the job.

CONTROLM

Shared or exclusive control over resources required for the job.

RESOURCEM

Quantitative resources required for the job.

PIPE

Name of a data set replaced by a pipe during the run of the job. Available only at sites in which MAINVIEW Batch Optimizer (MVBO) is installed.

TIME + DAYS

Time limit (FROM, UNTIL) for job submission.

PRTY

Job priority in receiving Control-M services or critical path priority.

CONFIRM

Yes or No indicator (Y/N) specifying whether manual confirmation is required before the job can be submitted.

DUE OUT + DAYS

Time by which the job must finish executing.

SAC

Enables scheduled runs of a job that was converted from another job scheduling product, such as CA-7, to be shifted to their proper scheduling days.

TIME ZONE

Enables automatic adjustment of the times specified in the job definition to the corresponding times in a different time zone.

Parent Topic

Job Scheduling Definition Screen – Defining Schedules