Indicates the name of a Control-M calendar that is used to validate scheduling dates. A shift value can be used to indicate how to handle jobs that are scheduled for a non-working day in the calendar. The Calendar specified for Confirmation calendar must be a regular Calendar (not a periodic calendar). This calendar is used for validating scheduling dates and determining the scheduled work day.
Jobs to be scheduled on a given day are checked against the Confirmation calendar:
If the job’s scheduling criteria also include the day to which it is shifted, it runs only once on that date (not once for regular scheduling, and once to make up for the shifted day).
NOTE:
Additional information |
Description |
---|---|
Usage |
Optional |
Length |
Valid calendar name, up to 30 characters in length. z/OS: 1-8 characters |
Case Sensitive |
Yes |
Invalid Characters |
|
Variable Name |
None |
Alternate names |
|
Parent Topic |