5215 ALL RERUNS HAVE BEEN PERFORMED. MAXRERUN = number

Explanation:All the reruns have been performed and the job exceeded the number value of the maxrerun parameter. When the job's completion status sets to Rerun using the Do Rerun parameter, Control-M checks the number of reruns specified in the Maximum parameter. If the number in the Maximum parameter is greater than the number of reruns that have already been performed for the job, a rerun (automatic rerun) process is performed for the job.

The job will not continue to rerun, and will move to a post-processed state.

Corrective Action: No action is required.

Parent Topic

Control-M/Server Messages