Previous Topic

Next Topic

Book Contents

Book Index

Next expected run

Specifies the next expected submission date and time for the job, for rerun or cyclic jobs that use the Interval option.

This parameter is relevant for z/OS only.

Additional information

Description

Usage

Optional

Format

Date calendar

Variable Name

None

Alternate Names

  • Control‑M/EM Utilities: NEXT_RUN
  • Control-M Report: NEXT RUN
  • Control‑M/Server Utilities: -nextrun
  • Control‑M/EM API: next run

Sub-parameters

Date

Calendar

  • dd-mm-yy
  • 01-Jan-12

Time

HH:MM

Parent Topic

Scheduling Parameters