Previous Topic

Next Topic

Book Contents

Book Index

Maintenance job logs

When an upgrade job runs a log is generated. After a job is completed the user can examine the job to learn about the status of the job. If the job was not successful, instructions indicate what corrections must be made before running the job run again.

A date and time stamp at the beginning of the log indicates when the job began.

An analysis is provided for each step of the job, including the condition and return codes.

A date and time stamp at the end of the log indicates when the job completed. The job return code indicates if the job completed successfully.

A sample job log is shown in the following figure.

Figure 9 Sample job log

********************* Top of Data **********************************

25 Apr 2010 15:56:54 - H700INS3 JOB16690 STARTED

Job Step ACCPTCHK.SMPIOA, CC=12

********************************************************************

Start Analyzing: Step=ACCPTCHK.SMPIOA DD=INDD1

GIM24801S ** NO SYSMODS SATISFIED THE OPERANDS SPECIFIED ON THE

ACCEPT COMMAND.

* No Applicable PTFs is Acceptable. Step Rc = 04

********************************************************************

ANALYSIS Complete for step ACCPTCHK.SMPIOA STEPCC=(04)

25 Apr 2010 15:57:04 - H700INS3 JOB16690 COMPLETED - JOBRC(00)

********************** Bottom of Data ******************************