The New Day procedure is the primary mechanism used to perform daily maintenance on the Control-M/Tape Media Database and related files. The New Day procedure (job CTTDAY), can be activated automatically by a scheduler (for example, Control-M) at a predefined time each day. It can also be activated manually.
When establishing the New Day procedure for Global Test mode:
Two New Day procedure members (CTTDAY and CTTDAYT) are provided with Control-M/Tape, each with an alternate order of procedures. Ensure that the correct one is used at your site.
Note: If the order of procedures in the Control-M/Tape New Day procedure is different from the order in the other tape management system, it could lead to inconsistencies in retention (reflected in the daily scratch and vaulting reports).
Comment out (//*) the JCL steps that you do not want to run while in Global Test mode (for example, stacking statistics collection). Do not delete these steps. They are used when Control-M/Tape is activated in Global Phased mode and Global Production mode.
Control-M/Tape maintenance functions should run in parallel with (at the same time as) the maintenance utilities of the existing tape management system at your site. New Day procedure CTTDAY is compatible with most tape management systems. If you are converting from CA-TLMS, run CTTDAYT in the JCL library instead of CTTDAY. In CTTDAYT, the vaulting step precedes the retention step in order to maintain compatibility with CA-TLMS.
The following tasks are performed by the New Day procedure:
Each of these tasks is described below, with special attention given to issues relevant for Control-M/Tape operations in Global Test mode.
Parent Topic |