These parameters specify the conditions that must exist before the mission is eligible for activation.
Figure 60 Runtime Scheduling Parameters
===========================================================================
IN END_OF_MONTH_OK ODAT +
TIME FROM 1500 TO 2400 NOT LATER THAN 2000 PRIORITY
===========================================================================
Table 68 Runtime Scheduling Parameters
Parameter |
Description |
---|---|
IN M |
Prerequisite conditions that must exist before the rule is activated. After filling in the prerequisite condition name and pressing Enter, Control-M/Analyzer creates a field for entering a date reference. (Default = Control-M/Analyzer working date.) |
TIME |
Time limits (FROM, UNTIL) for executing the mission. |
NOT LATER THAN |
Time by which the mission is activated even if prerequisite conditions do not exist. |
PRIORITY |
For future use. |
Parent Topic |