General Information for SAC

Many scheduler products do not allow the site to define the time of the new working day. Instead, those products fix the time, such as midnight. Control-M, however, allows the site to define when the new working day starts.

In most cases, this added Control-M flexibility can be utilized without additional adjustment. Occasionally, however, an adjustment to the job schedule may be required due to the differences between the start of the working day. The SAC parameter is used to perform such an adjustment.

For information on the correct usage of the SAC parameter, see the Conversion Guide provided for your specific product.

Note: Unless you are certain that SAC must be used, and you are certain how to use it, leave this parameter blank.

Parent Topic

SAC: Run Time Parameter