The following example provides a simplified demonstration of how Control-M can be used to monitor IMS. Prerequisite conditions, CHANGE-ACCUMULATION and LOGCLOSE-NEEDED, can be used as IN prerequisite conditions to trigger the execution of IMS maintenance jobs that depend on those conditions.
Figure 187 DO COND Parameter
JOB: IMSPROD LIB CTM.PROD.SCHEDULE TABLE: IMSPROD
COMMAND ===> SCROLL===> CRSR
+---------------------------------------------------------------------+
=====================================================================
OUT IMS-ACTIVE **** -
AUTO-ARCHIVE Y SYSDB Y MAXDAYS MAXRUNS
RETENTION: # OF DAYS TO KEEP 030 # OF GENERATIONS TO KEEP
SYSOUT OP (C,D,F,N,R) FROM
MAXRERUN RERUNMEM INTERVAL FROM
STEP RANGE FR (PGM.PROC) . TO .
ON PGMST STEP01 PROCST CODES U0421 A/O
DO COND CHANGE ACCUMULATION ODAT +
DO
ON PGMST STEP01 PROCST CODES U0428 A/O
DO COND LOGCLOSE-NEEDED ODAT +
DO
ON PGMST STEP01 PROCST CODES U0426 A/O
DO SHOUT TO U-DBA URGENCY V
= *** IMSPROD ABENDED WITH U0426 ****
DO
ON PGMST PROCST CODES A/O
DO
ON SYSOUT FROM 01 TO 132 A/O
DO
ON VAR
DO
SHOUT WHEN TIME + DAYS TO URGN
COMMANDS: EDIT, DOC, PLAN, JOBSTAT 11.17.00
Parent Topic |