Examples for CONFCAL

CONFCAL Example 1

This example is based on the following assumptions:

Schedule the rule on the 1st, 7th and 15th day of the month if they are both Saturdays and working days in WORKDAYS. If the day of the month (1st, 7th, 15th) is not a Saturday, do not schedule the rule. If the day of the month is a Saturday but is not a working day, schedule the rule on the next working day.

DAYS    - 1,7,15

AND/OR  - AND

WDAYS   - 6

CONFCAL - WORKDAYS

SHIFT   - >

The rule is scheduled on the days of the month indicated by an asterisk:

Figure 156 Days When Job Scheduled

CONFCAL Example 2

Assume that the IOA installation parameter SWEEK was set to SUN (meaning that Sunday is the first working day of the week.)

Schedule the job on every Thursday, except when Friday is a holiday. If Friday is a holiday, schedule the job on the working day prior to Thursday.

Set the following parameter values:

WDAYS 6

CONFCAL WORKDAYS

SHIFT <-01

Parent Topic

CONFCAL: Basic Scheduling Parameter