Runtime Scheduling parameters define job submission criteria. The job is not submitted unless all submission criteria are satisfied. The following criteria can be defined:
Table 158 Runtime Scheduling Parameter Criteria
Parameter |
Description |
---|---|
IN |
Required prerequisite conditions. |
CONTROL |
Required exclusive or shared Control resources. |
RESOURCE |
Quantitative resources and the required quantity. |
PIPE |
Name of each data set that is replaced by a pipe during the run of the job. Available only at sites where MAINVIEW Batch Optimizer (MVBO) is installed. |
TIME + DAYS |
Time range during which the job must be submitted. |
TIME ZONE |
Enables automatic adjustment of the times specified in the job definition to the corresponding times in a different time zone. |
PRIORITY |
Job priority and critical path priority. |
DUE OUT |
Time by which the job must finish executing, which can determine the time by which the job must be submitted. |
CONFIRM |
Manual confirmation required before the job is submitted. |
CYCLIC TYPE |
Determines whether the enhanced cyclic feature is used. |
SPECIFIC TIMES |
Specifies the specific times when cyclic jobs will run. |
INTERVAL SEQUENCE |
Specifies the sequence of intervals that will separate the job runs. |
Parent Topic |