When you finish testing the two versions in parallel, you must remove the changes applied by the above procedure. The following steps describe how to remove the relevant changes:
If the new Control‑M/Tape version is active, bring it down using the following operator command:
S xxxINIT,PARM=TERM
where xxx is the procedure prefix that you selected during installation of Control‑M/Tape.
Set the following parameters in the CTTPARM member:
MODET=PROD
PARALLEL=N
RBTTYPE=(according to site configuration)
Note: After you remove parallel execution support, only one Control‑M/Tape system can be active in each system. Running two systems in parallel without the required support can cause unpredictable results.
Parent Topic |