It is recommended that you establish dependency between the successful execution of the job under Control‑M and the processing of the job’s reports by the Control‑D report decollating mission. The dependency can be established using a prerequisite condition. Parameter OUT of the job order under Control‑M must specify a prerequisite condition to be referenced by parameter IN of the Control‑D report decollating mission.
The following figure shows a Job-Report dependency:
Figure 48 Job-Report Dependency