Usage Alerts
Usage alerts notify you when the number of tasks in a Control-M/Enterprise Manager environment exceed the permitted limit of tasks in the Active Jobs file. You can configure the following alert settings:
-
Platforms where you set task counts and alerts.
-
Daily task limit across all Control‑M/EM environments.
-
Percentage of the task limit that triggers an alert when exceeded.
-
Recipients who receive alert notifications when the task count exceeds the limit.
-
The Control‑M/EM environment that manages task counts and sends alerts when the task count exceeds the limit.
Creating a Usage Alert
This procedure describes how to create a usage alert, which enables you to set alerts when the number of tasks in a a Control-M/Enterprise Manager environment exceeds the permitted limit.
Before You Begin
-
Configure the EmailSender and EmailServer parameters, as described in Control-M/EM General Parameters.
-
Verify that you have an active environment available or add a new one, as described Adding a Usage Alert Environment.
Begin
-
From the
icon, select Configuration.The Configuration domain opens.
-
From the
drop-down list, select System Settings.The System Settings dialog box appears.
-
In the Usage Alerts tab, click the environment that requires the usage alerts.
-
Toggle on Enable usage alerts.
A list of the environments appears.
-
Select the relevant environment to set a usage alarm and click
.If you have both a Control-M for z/OS and a Control-M for Distributed Systems platform, select All Applications.
-
In the total permitted job tasks field, set the number of permitted tasks.
-
In the table below the total permitted job tasks field, configure the following:
-
Limit: Determines the percentage of the permitted tasks that triggers an alert when the level is exceeded. The limit must be between 50 to 100 percent.
-
Send Email Alert To: Defines the email addresses of the alert recipients. You must separate multiple email addresses with a comma.
-
-
Click Save.
Adding a Usage Alert Environment
This procedure describes how to add a usage alert environment, which enables you to manage task counts on all Control-M/Enterprise Manager environments and send alerts when the task count exceeds the permitted limit.
Begin
-
From the
icon, select Configuration.The Configuration domain opens.
-
From the
drop-down list, select System Settings.The System Settings dialog box appears.
-
In the Usage Alerts tab, toggle on Enable Usage Alerts.
The Add Environment to Enable Usage Alerts dialog box appears.
-
Click Add Environment.
-
Define the required parameters, as described in Control-M/EM Parameters.
-
Click Test to check that the environment is available.
A message appears to confirm that the environment is available. If the environment is unavailable, the test fails, and you cannot save your alert settings.
-
Click Add.
Control-M/EM Parameters
The following table describes the Control-M/EM parameters.
|
Parameter |
Description |
|---|---|
|
Environment Name |
Defines a logical display name for Control-M/EM. |
|
Database Type |
Determines which database is used for the Control-M/EM database:
|
|
Host |
Defines the database host in a Control-M/EM installation. The host can be the current installation or a Distributed Control-M/EM environment. |
|
Port |
Defines the database server port number for the Control-M/EM installation. |
|
Database Instance |
Defines the instance name of the database based on one of the following Database Types you selected:
|
|
Username |
Defines the database username. |
|
Password |
Defines the database password. |