Quantitative Resource rule

The following table describes the fields to adjust the quantitative resource at a specified time.

Field

Description

Update quantitative resource maximum quantity

Control-M

Name of the Control-M whose jobs are included in this exception definition.

Resource

Modifies the quantitative resource, which represents a measure that can be quantified.

Maximum

Modifies the maximum quantity of this quantitative resource that can be used by jobs concurrently according to one of the following settings:

  • Set to
  • Increase by
  • Decreased by

At (Sets when the event is triggered)

New Day time

The time that the New day procedure is scheduled to run.

Time

Time of day at which the job starts, specified in hours and minutes using the 24-hour clock format (HH:MM). This is based on the time of the Control-M on which the job is run.

Calendar details (click Advanced) Applies to Service Assumption and Forecast/BIM rules

Calendar

Details of the Control-M and calendar to be used to schedule the job.

Period

Name of one or more period for this exception definition, which can be selected from a list. Special month rules are not supported.