Previous Topic

Next Topic

Book Contents

Book Index

Average run time +/-

The percentage of the time (based on the average run time for the job) or the number of minutes that the job can be early or late, and still be considered on time.

NOTE: This parameter is relevant for BIM jobs only.

Additional information

Description

Usage

Optional

Format

  • Numbers up to 999
  • Drop-down list: Percentage or Minutes

Length

  • Percentage: 999
  • Minutes: 999

Default

  • Percentage (Default): 100
  • Minutes: 100

Variable Name

None

Parent Topic

General parameters