The following table describes the fields to adjust the quantitative resource at a specified time.
Field |
Description |
---|---|
Update quantitative resource maximum quantity |
|
Control-M |
Name of the Control-M whose jobs are included in this exception definition. |
Resource |
Modifies the quantitative resource, which represents a measure that can be quantified. |
Maximum |
Modifies the maximum quantity of this quantitative resource that can be used by jobs concurrently according to one of the following settings:
|
At (Sets when the event is triggered) |
|
New Day time |
The time that the New day procedure is scheduled to run. |
Time |
Time of day at which the job starts, specified in hours and minutes using the 24-hour clock format (HH:MM). This is based on the time of the Control-M on which the job is run. |
Calendar details (click Advanced) Applies to Service Assumption and Forecast/BIM rules |
|
Calendar |
Details of the Control-M and calendar to be used to schedule the job. |
Period |
Name of one or more period for this exception definition, which can be selected from a list. Special month rules are not supported. |