The following table describes the Run Time rule, which adjusts the estimated job run time by changing the percentage of the run time or the actual time:
Field |
Description |
---|---|
Update Run Time |
|
Percent |
Modifies the estimated job runtime by the specified percentage, and defines whether to increase or decrease the time. |
Time |
Modifies the estimated job runtime by the specified fixed time value. The time used is time of day at which the job starts, specified in hours and minutes using the 24-hour clock format (HH:MM). This is based on the time of the Control-M on which the job is run. Defines whether to set to =, <, or >. |
For all jobs meeting the following criteria |
|
Control-M |
Name of the Control-M whose jobs will be included in this exception definition.* |
Application |
Name of the application whose jobs are included in this exception definition. |
Sub Application |
Name of the Sub Application whose jobs are included in this exception definition. |
Job Name |
Name of the job that will be included in this exception definition.* |
Mem Name |
Name of the member name (for z/OS) that is included in this exception definition.* |
MemLib |
Name of the member library (for z/OS) whose jobs are included in this exception definition.* |
Folder |
Name of the container into which job processing definitions are organized. |
Folder Lib |
Name of the library that contains the job’s table. |
Host ID |
Name of a host computer to which a job was submitted. |
Run as |
Identifies the user name for whom the job is executed. |
Created by |
Indicates the Control-M/EM user who defined the job. |
Calendar details (click Advanced) Applies to Service Assumption and Forecast/BIM rules |
|
Calendar |
Details of the Control-M and calendar to be used to schedule the job. |
Period |
Name of one or more period for this exception definition, which can be selected from a list. Special month rules are not supported. |
Parent Topic |