The following table describes general information about the selected service.
Service Information |
Description |
---|---|
Name |
Name of service. |
BIM |
Defines whether the service is a BIM service. If the icon appears, the service is a BIM. |
Description |
Provides a description of the service in free text. A well written description can help you determine how the service fits into your workflow. |
Status Code |
Shows the graphic and code that represents the status details. |
Status Details |
Shows the status of the service, as described in Service Status Details. |
Deadline |
Determines the time when the service must complete to be considered not late. |
Note |
Provides specific service information. For more information, see Adding a service note. |
Start Time |
Shows the timestamp when the service started to run. |
Estimated End Time |
Shows the time when the service is estimated to stop running. |
Progress |
Shows the progress bar the percentage of the jobs that have completed in the service. |
Total Jobs Number |
Total number of jobs in the service. |
Jobs Completed |
The number of jobs completed. |
Jobs Without Statistics |
The number of jobs without statistic information. |
Priority |
Shows the priority level of the service. |
Ordered By |
Shows the name of the person who ordered the service. |
Order Time |
Shows the time the service was ordered. |
Slack Time |
Shows the difference in time, in the format HH:MM, between the due time of the service and its estimated end time. EXAMPLE: If the service must end by 10:15 (due time), and its estimated end time is 10:05, its slack time is 10 minutes. This information, together with the service priority level, can help you decide which problems are most urgent. |
Last Status Update |
Shows the last time the status was updated. |
Avg Completion Time |
Shows the time Batch Impact Manager estimates that the service will complete. This calculation is based on existing Control-M average run time statistics or exceptions. |
Problematic Jobs |
Shows the ID number and the Job name of the problematic jobs. |
NOTE: If a job is associated with a Workload and the Workload has limitations defined for quantitative resources, then a line is displayed in the Status pane indicating this submission criteria and its status.
Parent Topic |