Installing Control-M Workload Change Manager on Windows
This procedure describes how to install Control-M Workload Change Manager on a Control-M/EM server on Windows, which enables you to start working with Control-M Workload Change Manager.
NOTE: In a high availability environment, you must perform this procedure on the primary host only when it is active.
Before you begin
Ensure that the database server that contains the Control-M/EM database is up and running.
Verify that the default web server port 18080, 8443 for HTTPS, or another configured port that you want to use is open and free for use.
Download the Control-M Workload Change Manager installation files (see Product Distribution in the Control-M Release Notes).
To install Control-M Workload Change Manager on Windows:
From the Control-M Workload Change Manager activation CD, double-click the setup.exe file.
The Control-M Workload Change Manager Installation Wizard appears.
Do one of the following:
Interactive install: Follow the on-screen instructions until the installation is complete.
Automatic install: Create a parameter file and then run the automatic install in a non-interactive mode, as follows:
Follow the on-screen instructions until the Summary window.
Click Generate and select the location to create the XML parameter file.
Click Yes to quit the installation.
A confirmation message appears.
Click Yes.
Copy the automatic installation parameters file to a network location that is accessible to all computers where you want to perform an automatic installation.
Log in using a user ID that has Administrator permissions on the current computer.
Ensure that the installation DVD is still in the DVD drive, and run the installation script, as follows: