Status parameters describe information that is collected as the result of a job run. They have the following common characteristics:
status parameters are summarized in the following table:
Parameter |
Description |
|
---|---|---|
Average Run Time |
Average time taken, in minutes, for the job to run. This statistic is compiled from the last successful runs of the job. |
|
Current Status |
Indicates the completion status of the job (for example, Ended Not OK). |
|
Deleted |
Indicates if the job was deleted. |
|
Due In |
Time and day at which the next run of the job should start executing. |
|
+ num days |
The number of days that the start of job execution is extended after the ODAT. This sub-parameter is relevant only for jobs running under Control‑M for z/OS version 6.2.00 or later. |
|
Due Out |
Time and day by which the next run of the job should stop executing. |
|
Format |
HHMM, where HH is a 2-digit number from 00 through 24. |
|
+ num days |
The number of days that the end of job execution is extended after the ODAT. This sub-parameter is relevant only for jobs running under Control‑M for z/OS version 6.2.00 or later. |
|
Elapse |
Length of time (in minutes) that the job is expected to run. |
|
End Time |
Indicates the time that the last run of the job ended. |
|
From Proc |
For z/OS jobs only with Control-M/Restart: Procedure step from which the job should be rerun. |
|
From Step |
For z/OS jobs only with Control-M/Restart: Step from which the job should be rerun. |
|
Hold |
Indicates if the job is currently being held. |
|
Job ID |
Unique serial number assigned to the job by the Control‑M server. |
|
Next Time |
Determines the next time that the job runs for reruns or cyclic jobs that use the Interval option. |
|
NJE |
Indicates that the job was sent for execution to a computer that is connected to Control-M through NJE (the node does not have a shared spool with Control-M). |
|
NJE Node |
Node ID of the NJE terminal. |
|
Rerun Counter |
Indicates how many times the job was run. |
|
Restart |
Indicates if the job was restarted. |
|
Search Count |
Number of times Control-M has looked for the job. |
|
Standard Deviation |
Standard deviation from the average runtime. This statistic is compiled from the last successful runs of the job. |
|
Start Time |
Indicates the time that the last run of the job started. |
|
To Proc |
For z/OS jobs only with Control-M/Restart: Procedure step until which the job should be rerun. |
|
To Step |