Indicates the relationship (AND/OR) between RBCs criteria and basic scheduling criteria in the job processing definition (that is, whether either set of criteria, or both sets of criteria, must be satisfied).
Additional information |
Description |
---|---|
Usage |
For jobs that are in folders. |
Format |
Option buttons. When or is selected, if either set of criteria (a specified RBC or the job’s basic scheduling criteria) is satisfied, the job is scheduled. Default. When and is selected, both a specified RBC and the job’s basic scheduling criteria must be satisfied for the job to be scheduled. |
Invalid Characters |
Non-English characters |
Variable Name |
None |
Alternate names |
|
For jobs in folders, two types of basic scheduling criteria can be specified:
In some cases, both sets of criteria must be satisfied for the job to be scheduled. In other cases, it is sufficient if either set of criteria is satisfied. The AND-OR option enables you to specify the required combination:
NOTE:
Parent Topic |