This procedure describes how to allocate a control resource for a Job, which enables you to specify the type of control the Job needs.
Before you Begin
Open the Job Flow Workspace that holds the Jobs with the intended control resource. For more information, see Setting up a Control-M Workspace.
To allocate control resources:
The Job properties pane appears on the right.
The Job properties are enabled for definition.
A new row is added to the Control Resources list.
The control resource is allocated.
Parent Topic |