The following table describes the various scheduling options:
Take into consideration that some options might not appear in your properties pane, if they were not specified in the User View you applied.
Option |
Description |
---|---|
Every day |
Defines the scheduling to be every day, and only runs if all the prerequisite running criteria are met. |
None (Manual Order) |
Defines no scheduling. |
Specific dates |
Defines specific dates for the schedule up to 12 dates. |
Free space on PDS |
(Control-M for z/OS only) Defines the name of a partitioned data set (PDS) to be checked for free space. The following fields are defined:
|
Use parent schedule |
Defines scheduling for a Job or sub-Folder in a SMART Folder according to the scheduling criteria of the parent SMART Folder. |
Advanced |
Defines a combination of scheduling options, as described in Scheduling Jobs using the advanced scheduling options. |