Previous Topic

Next Topic

Book Contents

Book Index

Examples

Example 1

Schedule a mission in all months of the year:

MONTHS  1- Y 2- Y 3- Y 4- Y 5- Y 6- Y 7- Y 8- Y 9- Y 10- Y 11- Y 12- Y

Example 2

Schedule a mission every day in March and September.

Figure 404 MONTHS Parameter – Example 2

  ---- CONTROL-D CATEGORY MARCH-SEPTEMBER      BKP MISSION BKP0031D --------(M.S)

  COMMAND ===>                                                    SCROLL===> CRSR

  +-----------------------------------------------------------------------------+

    CATEGORY MARCH-SEPTEMBER                   MISSION BKP0031D

    OWNER    M22           TASKTYPE BKP        GROUP   MAR_SEP-BKP

    BATCH            SKELETON                  FREE               TIMEOUT

    OVERRIDE CLASS   DEST                      EXTWTR             FORM

    WRITER OPTION

    DESC     BACKUP REPORTS FOR 200 DAYS, SCHEDULED IN MARCH AND SEPTEMBER

    DESC

    ===========================================================================

    DAYS    ALL                                                   DCAL

                                                                       AND/OR

    WDAYS                                                         WCAL

    MONTHS  1- N 2- N 3- Y 4- N 5- N 6- N 7- N 8- N 9- Y 10- N 11- N 12- N

    DATES

    CONFCAL          SHIFT   RETRO N MAXWAIT 00

    MINIMUM          PDS

    ===========================================================================

    IN        OP-START-BACKUP-031D ODAT

    TIME FROM      TO      NOT LATER THAN      PRIORITY

    ===========================================================================

    # OF DAYS TO KEEP 00200                    # OF GENERATIONS TO KEEP

  PLEASE FILL IN MISSION PARAMETERS. USE "SHPF" TO SEE PFK DEFINITION    12.53.58

Parent Topic

MONTHS: Basic Scheduling Parameter