The report decollating mission is scheduled for execution only on the dates specified in parameter DATES.

Parameter DATES cannot be used with parameters PDS, MINIMUM, MONTHS, DAYS and DCAL.

To specify more than 12 dates for one report decollating mission, define the dates in a calendar (instead of using this parameter) and specify the calendar in DCAL (or WCAL).

The relationship between DATES and WDAYS/WCAL is OR. If the report decollating mission should be scheduled according to the DATES parameter or according to the WDAYS/WCAL combination, it is scheduled.

Parent Topic

DATES: Basic Scheduling Parameter (decollating mission)