Two examples of invoking Control-M/Analyzer include
In these cases, you would add a job step to an already existing job in the correct location in that job. This job step would then call the Control-M/Analyzer balancing rule. You would not need to define special scheduling criteria for the balancing rule, as the rule would fit into whatever scheduling criteria are specified for the existing job.
Parent Topic |