Basic Scheduling Parameters

   DAYS                                                          DCAL           

                                                                      AND/OR   

   WDAYS                                                         WCAL           

   MONTHS  1- Y 2- Y 3- Y 4- Y 5- Y 6- Y 7- Y 8- Y 9- Y 10- Y 11- Y 12- Y

   DATES                                                                        

   CONFCAL          SHIFT   RETRO N MAXWAIT 00                                 

   MINIMUM          PDS                                                        

A scheduling program called by the New Day procedure CTDNDAY analyzes these parameters to determine if the mission should be placed in the Active Missions file. The various options for scheduling were detailed in Schedule Restore Mission to the Active Missions File.

We recommend that you select a method for scheduling of the restore missions and implement it at this stage. This will mean that the restore procedures will be in place for the implementation of Control-D into production (which will occur in Phase 8).