Previous Topic

Next Topic

Book Contents

Book Index

CA-TLMS Conversion Process

The process of conversion from CA-TLMS to Control-M/Tape includes

The steps required for CA-TLMS to Control-M/Tape conversion are described in detail in the remainder of this chapter. The conversion steps are accessed by the INCONTROL Installation and Customization Engine (ICE).

Use the following steps to begin conversion from CA-TLMS to Control-M/Tape.

  1. If you are converting from TLMS version 5.3, 5.4, or 5.5, rename the following items:

    Old Name

    New Name

    CTTCTR1

    CTTCTR16

    CTTCTR2

    CTTCTR26

    CTTCTR4

    CTTCTR46

    CTTCTR15

    CTTCTR1

    CTTCTR25

    CTTCTR2

    CTTCTR45

    CTTCTR4

    Old Name

    New Name

    CONVTREP

    CONVTRE6

    CONVTRE5

    CONVTREP

  2. Enter ICE as described in the ICE chapter of the INCONTROL for z/OS Installation Guide.
  3. In the Major Step Selection screen, type CTT in the product field, select "INSTALL CTx" (ICE option 3) from the IOA installation menu, and press Enter. The Control-M/Tape installation menu is displayed.
  4. Choose major step 14 "Conversion from CA-TLMS"

    Figure 8 ICE Screens for Converting CA-TLMS to Control-M/Tape

---------------------------- Minor Steps Selection ---------------------------

                                                                             

Environment: IOA610    Product: CTT                                         

Major Step: 14  Conversion from CA-TLMS                                    

                                                                             

Sel values: S Select step     C Mark step as completed    R Reset status   

             B Browse Step     X Mark step as excluded     ? Help            

PF7/PF8  To scroll through all Steps                                       

-----------------------------------------------------------------------------

Sel  Step Status   Type    Opt Description                                 

===  ==== ======   ====    === ===========                                 

                                                                             

  .     1  *        Edit     R  Set Conversion Parameters                    

  .     2           Job      R  Compile and Link Conversion Programs         

  .     3           Extrnl      Stop Tape Activity                           

  .     4           Job         Format Media Database                        

  .     5           Extrnl      Prepare CA-TLMS VMF for Conversion           

  .     6           Job         Create CA-TLMS Reports                       

  .     7           Job         Convert Reports into Media Database         

  .     8           Job         Convert the RMF into Rules                  

  .     9           Extrnl      Define EDM Rules and TLMSIPO Rules           

  .    10           Extrnl      Define Vaults                                

  .    11           Extrnl      Define Scratch Pools and Related Rules      

  .    12           Extrnl   R  Adjust Rule List                             

  .    13           Job         Apply Vault Rules                           

  .    14           Job         Apply Retention Rules                        

  .    15           Job         Verify Media Database Integrity              

  .    16           Extrnl      Resume Tape Activity                        

  .    17           Extrnl      Adjustments                                 

  .    18           Job      Y  Collect Statistics for Stacking              

------------------------------> End of Minor Steps <-------------------------

ICE screens can be used to check and record your progress during conversion, and to run some of the jobs performed during certain conversion steps.

If you are not yet familiar with ICE, BMC recommends that you review Installation and Customization Engine chapter of the INCONTROL for z/OS Installation Guide.

Parent Topic

Conversion from CA-TLMS