Step 7: Resume Tape Activity
If tape activity was not yet restarted, you can restart it at this point.
- If CA-1 was stopped, and Control-M/Tape will be operating in Global Test mode or in Global Phased mode, start CA-1 now.
- Start Control-M/Tape with the following command:
S CTTINIT,PARM=‘MODE=INIT’