Specifies prerequisite conditions for mission execution. The mission is activated only if the specified prerequisite conditions exist.
Figure 326 IN Parameter Format
Optional (but recommended).
A maximum of two prerequisite conditions can be specified in each IN line. Upon specifying the second prerequisite condition in a line and pressing Enter, a new line is opened (for specifying additional prerequisite conditions).
Each specified prerequisite condition consists of the following mandatory subparameters:
Table 284 IN Subparameter
Subparameter |
Description |
|
---|---|---|
condName |
User-supplied descriptive name of 1-20 characters used to identify the condition. |
|
dateRef |
4-character date reference. Valid values are: |
|
date |
Specific date (in either mmdd or ddmm format, depending on the site standard). |
|
STAT |
Static. Indicates that the condition, (for example, PRINTER-SET) is not date dependent. |
|
ODAT |
Control-M/Analyzer working date. Default. |
|
PREV |
Previous scheduling date. |
|
**** |
Any scheduling date. |
|
$$$$ |
Any scheduling date. |