Previous Topic

Next Topic

Book Contents

Book Index

Examples

The examples in this chapter are based on the following assumptions:

At the end of each example, asterisks in a December 2001 calendar indicate the days on which the mission is scheduled.

Example 1

Schedule the mission on the 17th day and the last day of the month.

DAYS       17,L01

The mission is scheduled on the days of the month indicated by an asterisk

Figure 308 DAYS Parameter – Example 1:

Example 2

Schedule the mission on all working days of the month except the 6th day of the month, and also schedule the mission on the 1st day of the month.

DAYS       +1,-6

DCAL      WORKDAYS

The mission is scheduled on the days of the month indicated by an asterisk:

Figure 309 DAYS Parameter – Example 2

Example 3

Schedule the mission on all working days of the month except the first and last working days, and except the 17th day, of the month.

DAYS      -D1,-17,-L1

DCAL      WORKDAYS

The mission is scheduled on the days of the month indicated by an asterisk:

Figure 310 DAYS Parameter – Example 3

Example 4

Schedule the mission on the 8th day of the month. If it is not a working day, schedule the mission on the closest preceding working day.

DAYS      <8

DCAL      WORKDAYS

The mission is scheduled on the days of the month indicated by an asterisk:

Figure 311 DAYS Parameter – Example 4

Example 5

Schedule the mission on the 1st day of period A, and on all days, except the 2nd day, of period B. Do not schedule the mission on the 5th day of the month.

DAYS      -5,D1PA,-D2PB

DCAL      PERIDAYS

The mission is scheduled on the days of the month indicated by an asterisk:

Figure 312 DAYS Parameter – Example 5

Example 6

Schedule the mission on each Monday and on the 1st day of the month.

DAYS      1

AND/OR    OR

WDAYS     1

The mission is scheduled on the days of the month indicated by an asterisk:

Figure 313 DAYS Parameter – Example 6

Example 7

Schedule the mission on the 3rd day of the month provided it is a Monday.

DAYS      3

AND/OR    AND

WDAYS     1

The mission is scheduled on the days of the month indicated by an asterisk:

Figure 314 DAYS Parameter – Example 7

Example 8

Schedule the mission on the last Monday of the month:

DAYS      L1,L2,L3,L4,L5,L6,L7

AND/OR    AND

WDAYS     1

The mission is scheduled on the days of the month indicated by an asterisk:

Figure 315 DAYS Parameter – Example 8

Example 9

Schedule the mission on the 1st, 7th and 15th days of the month if they are both Saturdays and working days. If the day of the month (1st, 7th, 15th) is not a Saturday, do not schedule the mission. If the day of the month is a Saturday, but it is not a working day, schedule the mission on the next working day.

DAYS      1,7,15

AND/OR    AND

WDAYS     6

CONFCAL   WORKDAYS

SHIFT     >

The mission is scheduled on the days of the month indicated by an asterisk:

Figure 316 DAYS Parameter – Example 9

Example 10

Schedule the mission to run on the first Friday after the 15th of the month.

DAYS      16,17,18,19,20,21,22

AND/OR    AND

WDAYS     5

The mission is scheduled on the days of the month indicated by an asterisk:

Figure 317 DAYS Parameter – Example 10

Parent Topic

DAYS: Mission Definition Parameter