Create a new table, not a SMART Table, called IDGS3.
In table IDGS3, create four very basic job scheduling definitions, for IDJOB6, IDJOB7, IDJOB8 and IDJOB9, as follows:
In the MEMNAME field, specify, respectively: IDJOB6, IDJOB7, IDJOB8, or IDJOB9.
In the GROUP field, specify: IDGRP5.
In the DESCRIPTION field, specify: THIS IS IDJOB6 (or, respectively, IDJOB7, IDJOB8, or IDJOB9).
In the DAYS field, specify: ALL.
In the MONTHS field, specify: Y.
Do not specify any IN or OUT conditions, nor any Runtime Scheduling parameters.
Do not specify any Post-processing parameters.
In your JCL table, create separate JCLs that do nothing—for example, IEFBR14—for jobs IDJOB6, and IDJOB7, IDJOB8, and IDJOB9. Use the JCL from IDJOB1 as the basis for this JCL.
You will make changes to the JCL and job scheduling definitions, as required, during the performance of these exercises.