You can now return to the Why screen and see the results of your adding the missing condition and resources.
The Why screen, which was your last displayed screen in the Tracking and Control facility, is displayed.
Now that the required conditions and resources have been added, the Why screen shows the only remaining problematic runtime criteria: The TIME LIMIT problem.
------------------------ IDJOB3 SCHEDULING ANALYSIS --------------------(3.?)
COMMAND ===> SCROLL===> CRSR
OPT DESCRIPTION
TIME LIMIT FROM 2300 UNTIL 0400
====== >>>>>>>>>>>>>>>>>>>>> END OF "WHY" LIST <<<<<<<<<<<<<<<<<<<<< =====
You can correct this remaining problem in a screen called the Zoom screen, which is described in the following section.