Before beginning to define IDJOB4, display the schedule plan for IDJOB3.
Option P (PLN) in the Job List screen is used to request a graphic display of a schedule for job planning.
Figure 23 Option P (PLN)
JOB LIST LIB: CTM.TEST.SCHEDULE TABLE: IDGS1
COMMAND ===> SCROLL===> CRSR
OPT NAME ----- DESCRIPTION ---------------------------------------------------
IDJOB1 THIS JOB MUST BE RUN BEFORE JOB2
IDJOB2
IDJOB3 FISCAL RESULTS ON LAST FRIDAY OF MONTH
====== >>>>>>>>>>>>>>>> NO MORE JOBS IN TABLE <<<<<<<<<<<<<<<<<<< =====
OPTIONS S SEL D DEL I INS O ORDER F FORCE J JCL C COPY P PLN T JOBSTAT 15.37.39
Figure 24 Job Scheduling Plan Window
JOB LIST LIB: CTM.TEST.SCHEDULE TABLE: IDGS1
COMMAND ===> SCROLL===> CRSR
OPT NAME -------- DESCRIPTION ------------------------------------------------
IDJOB1 +---------------------+ FORE JOB JOB2
IDJOB2 | FROM DATE 020201 |
P IDJOB3 | TO DATE 040301 | FRIDAY OF MONTH
====== >>>>> +---------------------+ S IN TABLE <<<<<<<<<<<<<<<< =====
OPTIONS S SEL D DEL I INS O ORDER F FORCE J JCL C COPY P PLN T JOBSTAT 11.16.50
The default FROM DATE value is the current working date. The default TO DATE value is one month, or thirty days, following the current working date.
The Job Scheduling screen is displayed.
Figure 25 Job Scheduling Screen
JOB NAME: IDJOB3 JOB SCHEDULING DATES : 010201 - 280201
COMMAND ===> SCROLL===> CRSR
02 2001 MON TUE WED THU FRI SAT SUN
01 02 03 04
05 06 07 08 09 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
*
26 27 28
CMDS: NEXT, PREV, END 11.32.19
The Job Scheduling screen displays a calendar in graphic format. The dates within the specified date range on which the job is to be scheduled are marked with an asterisk.
Note: If the specified date range spans multiple months, a different calendar panel is displayed for each month, beginning with the first month. You can move between panels by pressing relevant PF keys. PF keys and their associated commands are explained in the following table.
Table 8 PF Keys and Screen Navigation Commands for
Job Scheduling Plan Screens
PF Keys |
Associated Commands |
---|---|
PF07/PF19 |
UP (scroll backward) |
PF08/PF20 |
DOWN (scroll forward) |
PF10/PF22 |
PREV (where applicable) |
PF11/PF23 |
NEXT (where applicable) |
Months in the date range in which the job is not scheduled are not displayed.
You can also display the Job Scheduling screen from the Job Scheduling Definition screen. To do so, enter PLAN in COMMAND field. This is especially useful for checking your definition of a complex schedule while you are working on it.