Some rules must be scheduled periodically, according to schedules that are not easily expressed in terms of fixed days and dates within months. In these cases, monthly, or even yearly, scheduling definition is awkward.
For example:
The IOA Calendar facility provides special calendars, called periodic calendars, to allow specification of these scheduling requirements. These periodic calendars are very flexible.
To designate a calendar as periodic, you must type the reserved string ==PERIODIC== in the first 12 positions of the description field. Any text can be entered in the rest of the description field. This is illustrated in Figure 87.
Figure 87 Use of the Reserved String "==PERIODIC=="
COMMAND ===> SCROLL===> CRSR
YEAR 2002 - ==PERIODIC== GENERAL WORKDAY CALENDAR
The following are characteristics of periodic calendars:
When a periodic calendar spans parts of two regular calendar years, special considerations are likely to arise. For more information, see Special Year-End Handling of Periodic Calendars.
By default, this period is preset to 33 days. Once the length of the gap between matching identifiers exceeds 33 days, the period automatically closes.
Note: The length of the default period can be changed from 33 days by the INCONTROL administrator, using optional Wish WM2888.
For more information on the use of periodic calendars, see DAYS: Basic Scheduling Parameter and WDAYS: Basic Scheduling Parameter.
Examples
The following are examples of periodic calendars:
Figure 88 Periodic Calendar – Example 1
-----S-------------S-------------S-------------S-------------S-------------S--
1 2 3 4 5 6 7 8 9 + 1 2 3 4 5 6 7 8 9 + 1 2 3 4 5 6 7 8 9 + 1
12 A A A B A
-----S-------------S-------------S-------------S-------------S-------------S--
1 2 3 4 5 6 7 8 9 + 1 2 3 4 5 6 7 8 9 + 1 2 3 4 5 6 7 8 9 + 1
01 B B
-----S-------------S-------------S-------------S-------------S-------------S--
This example contains two periods, A and B.
Figure 89 Periodic Calendar – Example 2
-----S-------------S-------------S-------------S-------------S-------------S----
1 2 3 4 5 6 7 8 9 + 1 2 3 4 5 6 7 8 9 + 1 2 3 4 5 6 7 8 9 + 1
03 B A B A
-----S-------------S-------------S----------0---S-------------S-------------S---
1 2 3 4 5 6 7 8 9 + 1 2 3 4 5 6 7 8 9 + 1 2 3 4 5 6 7 8 9 +
04 B
-----S-------------S-------------S-------------S-------------S-------------S--
This example includes a period B that begins on March 9. The last marked working day of the period is March 21, which is followed by a 33-day gap. Assuming that Wish WM2888 has not been used to alter the default period of 33 days, period B automatically ends on April 23, and April 24 marks the beginning of a new period B. If no more B identifiers are added, this new B period ends on May 27.