Manually ordering a job results in the job being scheduled only if its basic scheduling criteria are satisfied. Manually forcing a job results in its being scheduled even if its basic scheduling criteria are not satisfied.
To manually order all the jobs in a table, type O (ORDER) for the table in the Table List screen. Multiple tables can be ordered.
To manually force all the jobs in a table, type F (FORCE) for the table in the Table List screen. Multiple tables can be forced.
To manually order specific jobs in a table, type O (ORDER) for the jobs in the Job List screen.
To manually force specific jobs in a table, type F (FORCE) for the jobs in the Job List screen.