General Information for WDAYS

Negative values take precedence over positive values when determining whether a job is scheduled on a certain date. If a negative value (that is, format –n, –Dn, –Ln, - DnPi, or –LnPi) in either the DAYS or WDAYS field prevents a job from being scheduled on a date, the job is not scheduled on that date even if a positive value (such as Ln) in a basic scheduling parameter would otherwise result in the job being scheduled on that date.

If periodic and non-periodic values are mixed when specifying the WDAYS parameter, processing depends on the calendar type specified in the WCAL parameter:

The WDAYS parameter cannot be used with the PDS and MINIMUM parameters.