Customers who have in the past converted from a third-party scheduling party no longer need to propagate (copy) certain load modules to their newly created IOA Load library from their existing IOA Load library. The affected load modules (see the following table) are now supplied as part of the IOA Installation.
Table 35 Load modules supplied for third-party conversions
Third-party scheduling product |
Load modules |
---|---|
CA-7 |
CTMUTIL |
CA-SCHEDULER |
CTMUTIL |
CA-JOBTRAC |
CTMUTIL |
OPC (TWS - Tivoli Workload Scheduler) |
CTMUTIL |
ZEKE |
CTMZSET |