Previous Topic

Next Topic

Book Contents

Book Index

Multistage Migration

A maximum of 10 migration stages can be defined as a migration path in each migration mission. Single‑stage migration can be defined for reports whose remigration is not required.

Each migration stage specifies the target media, the age of the report in days when migration must occur, the cyclic time interval in days between refresh operations (when the report migrates to a new physical media of the same type), the prefix value (for migration to DASD and ROSs/OSS), and the FSET and VSET values (for migration to FileTek).

Parent Topic

Migration Mission Management (Control-V Only)