The entry panel is displayed upon entering the Workload Management facility, option W on the IOA Primary Option menu.
Figure 138a Workload Management Entry Panel
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
For the management of Workload Policies, enter the command for the relevant type of Workload Policies:
Command  | 
Description  | 
|---|---|
WL  | 
Locally managed Workload Policies created and managed in Control-M for z/OS These Workload Policies support workload optimization using Load-Indexes.  | 
WG  | 
Globally managed Workload Policies created and managed in Control-M/EM Workload Policies of this type are for viewing only, and cannot be managed through this facility. Global Workload Policies are supported by Control-M Batch Impact Manager (BIM) for use in the monitoring of critical job flows.  | 
Note: The WORKLDPL parameter controls which of these types of Workload Policies are available for use by your Control-M installation (whether only global, only local, or both). The WORKLDPL parameter is customized during Control-M installation or customization. For more information about this parameter, see Step 2.1 – Control-M operational parameters in the INCONTROL for z/OS Installation Guide: Installing or Selector subtask section in the INCONTROL for z/OS Installation Guide: Customizing.
For the management of Load-Indexes, select one of the following commands:
Command  | 
Description  | 
|---|---|
ID  | 
Display a list of Load-Indexes in the Load-Indexes Definition screen, and create new Load-Indexes or manage the definitions of existing Load-Indexes.  | 
IS  | 
Track the current status of defined Load-Indexes in the Load-Indexes Status screen, override the load level of any specific Load-Index, and view a history of load levels and changes for any Load-Index.  | 
Parent Topic |