Specifies prerequisite conditions for mission execution. The mission is activated only if the specified prerequisite conditions exist.
Figure 326 IN Parameter Format

Optional (but recommended).
A maximum of two prerequisite conditions can be specified in each IN line. Upon specifying the second prerequisite condition in a line and pressing Enter, a new line is opened (for specifying additional prerequisite conditions).
Each specified prerequisite condition consists of the following mandatory subparameters:
Table 284 IN Subparameter
Subparameter  | 
Description  | 
|
|---|---|---|
condName  | 
User-supplied descriptive name of 1-20 characters used to identify the condition.  | 
|
dateRef  | 
4-character date reference. Valid values are:  | 
|
date  | 
Specific date (in either mmdd or ddmm format, depending on the site standard).  | 
|
STAT  | 
Static. Indicates that the condition, (for example, PRINTER-SET) is not date dependent.  | 
|
ODAT  | 
Control-M/Analyzer working date. Default.  | 
|
PREV  | 
Previous scheduling date.  | 
|
****  | 
Any scheduling date.  | 
|
$$$$  | 
Any scheduling date.  | 
|
Parent Topic |